middle.news

Desert Metals Extends Tiogo Gold Corridor by 3km with New Drill-Ready Target

8:14am on Monday 25th of May, 2026 AEST Mining
Read Story

Desert Metals Extends Tiogo Gold Corridor by 3km with New Drill-Ready Target

8:14am on Monday 25th of May, 2026 AEST
Key Points
  • Tiogo gold corridor extended to 5.5km strike length
  • New Tiogo North soil anomaly peaks at 617 ppb Au
  • Only 1.5km of corridor previously drill tested
  • Aircore drilling planned to test Tiogo North
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Desert Metals (ASX:DM1)
OPEN ARTICLE