middle.news
Fulcrum Lithium Confirms Thick High-Grade Lithium at Alkali Flats
9:21am on Monday 25th of May, 2026 AEST
•
Mining
Read Story
Fulcrum Lithium Confirms Thick High-Grade Lithium at Alkali Flats
9:21am on Monday 25th of May, 2026 AEST
Key Points
Phase 3 drilling confirms lithium >300ppm in 18 of 20 holes
Multiple holes exceed 70m thickness with some over 100m
Deposit remains open in three directions over 32km²
Maiden Mineral Resource Estimate to incorporate dense drill data
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Fulcrum Lithium (ASX:FUL)
OPEN ARTICLE