middle.news
QPM Eyes Data Centre Boom with Isaac Energy Hub Expansion
8:20am on Monday 25th of May, 2026 AEST
•
Energy
Read Story
QPM Eyes Data Centre Boom with Isaac Energy Hub Expansion
8:20am on Monday 25th of May, 2026 AEST
Key Points
AEMO forecasts data centre demand up to 35 TWh by 2036
Coal-fired generation retirements tighten Queensland supply
QPM’s Bowen Basin assets mirror Texas data centre ecosystem
Plans to co-locate data centres with Isaac Energy Hub
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Qpm Energy (ASX:QPM)
OPEN ARTICLE