middle.news

Botala Energy’s Pitse Well 3.5B Hits Target Depth, Sets Stage for Flow Testing

10:11am on Thursday 28th of May, 2026 AEST Energy
Read Story

Botala Energy’s Pitse Well 3.5B Hits Target Depth, Sets Stage for Flow Testing

10:11am on Thursday 28th of May, 2026 AEST
Key Points
  • Pitse Pilot well 3.5B reaches 449m total depth
  • Coal seams confirmed consistent with geological model
  • Wireline logging underway to characterise reservoir
  • Completion materials and infrastructure ready for stimulation
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Botala Energy (ASX:BTE)
OPEN ARTICLE