middle.news

Strata Minerals Posts 94% Hit Rate in Phase 2 Drilling at Zelica Gold Project

9:50am on Wednesday 3rd of June, 2026 AEST Mining
Read Story

Strata Minerals Posts 94% Hit Rate in Phase 2 Drilling at Zelica Gold Project

9:50am on Wednesday 3rd of June, 2026 AEST
Key Points
  • Phase 2 drilling hits gold in 16 of 17 holes over 2,209m
  • Top intercept: 2m at 7.58g/t Au within 12m at 2.08g/t Au
  • Multiple stacked lodes confirmed, expanding system footprint
  • 9.5km prospective gold corridor largely untested
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Strata Minerals (ASX:SMX)
OPEN ARTICLE