middle.news
Strata Minerals Posts 94% Hit Rate in Phase 2 Drilling at Zelica Gold Project
9:50am on Wednesday 3rd of June, 2026 AEST
•
Mining
Read Story
Strata Minerals Posts 94% Hit Rate in Phase 2 Drilling at Zelica Gold Project
9:50am on Wednesday 3rd of June, 2026 AEST
Key Points
Phase 2 drilling hits gold in 16 of 17 holes over 2,209m
Top intercept: 2m at 7.58g/t Au within 12m at 2.08g/t Au
Multiple stacked lodes confirmed, expanding system footprint
9.5km prospective gold corridor largely untested
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Strata Minerals (ASX:SMX)
OPEN ARTICLE