middle.news
Greenvale Energy Advances Alpha Project Bitumen Product Testing with Technix
9:48am on Tuesday 9th of June, 2026 AEST
•
Energy
Read Story
Greenvale Energy Advances Alpha Project Bitumen Product Testing with Technix
9:48am on Tuesday 9th of June, 2026 AEST
Key Points
Initial assessment confirms bitumen-like product after volatile removal
Vacuum distillation improves penetration but viscosity remains below spec
Technix's Multistage Bitumen Process (TMPB) targeted to meet C-170 standard
Alpha Project holds 28Mt resource equating to 27.7 million barrels synthetic oil
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Greenvale Energy (ASX:GRV)
OPEN ARTICLE