middle.news

Greenvale Energy Advances Alpha Project Bitumen Product Testing with Technix

9:48am on Tuesday 9th of June, 2026 AEST Energy
Read Story

Greenvale Energy Advances Alpha Project Bitumen Product Testing with Technix

9:48am on Tuesday 9th of June, 2026 AEST
Key Points
  • Initial assessment confirms bitumen-like product after volatile removal
  • Vacuum distillation improves penetration but viscosity remains below spec
  • Technix's Multistage Bitumen Process (TMPB) targeted to meet C-170 standard
  • Alpha Project holds 28Mt resource equating to 27.7 million barrels synthetic oil
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Greenvale Energy (ASX:GRV)
OPEN ARTICLE