middle.news

Metallium Validates Multi-Unit Flash Joule Heating Operation with 83% Availability

8:24am on Tuesday 16th of June, 2026 AEST Mining
Read Story

Metallium Validates Multi-Unit Flash Joule Heating Operation with 83% Availability

8:24am on Tuesday 16th of June, 2026 AEST
Key Points
  • Three FJH units operated simultaneously for 12 hours
  • 83% availability and near 100% utilisation achieved
  • Approximately 0.3 tonnes of inert material processed
  • Campaign advances technology readiness from TRL 5 to TRL 6
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Metallium (ASX:MTM)
OPEN ARTICLE