middle.news
Metallium Validates Multi-Unit Flash Joule Heating Operation with 83% Availability
8:24am on Tuesday 16th of June, 2026 AEST
•
Mining
Read Story
Metallium Validates Multi-Unit Flash Joule Heating Operation with 83% Availability
8:24am on Tuesday 16th of June, 2026 AEST
Key Points
Three FJH units operated simultaneously for 12 hours
83% availability and near 100% utilisation achieved
Approximately 0.3 tonnes of inert material processed
Campaign advances technology readiness from TRL 5 to TRL 6
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Metallium (ASX:MTM)
OPEN ARTICLE