middle.news

Strike Energy Confirms 11 MMscf/d Gas Flow at Walyering West-1 with Low CO2 Levels

8:30am on Tuesday 16th of June, 2026 AEST Energy
Read Story

Strike Energy Confirms 11 MMscf/d Gas Flow at Walyering West-1 with Low CO2 Levels

8:30am on Tuesday 16th of June, 2026 AEST
Key Points
  • Stabilised flow rate of 11 MMscf/d from C1 sand
  • Low CO2 content of 1-2%, matching existing Walyering production
  • Higher condensate yield than current field levels
  • Potential for development using nearby Walyering facilities
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Strike Energy (ASX:STX)
OPEN ARTICLE