middle.news

Tungsten Mining Lifts Watershed Resource by 8% with Lower Cut-Off Grade

8:18am on Thursday 18th of June, 2026 AEST Mining
Read Story

Tungsten Mining Lifts Watershed Resource by 8% with Lower Cut-Off Grade

8:18am on Thursday 18th of June, 2026 AEST
Key Points
  • Cut-off grade lowered from 0.05% to 0.04% WO3
  • Total resource now 69.7 million tonnes at 0.109% WO3
  • Contained tungsten rises to 76,000 tonnes, up 8%
  • Resource reported under JORC 2012 with Multiple Indicator Kriging
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Tungsten Mining (ASX:TGN)
OPEN ARTICLE