middle.news

Azzuro Resources Confirms Extended Massive Sulphide Mineralisation at Red Hill with High-Grade Copper Intervals

8:22am on Wednesday 24th of June, 2026 AEST Mining
Read Story

Azzuro Resources Confirms Extended Massive Sulphide Mineralisation at Red Hill with High-Grade Copper Intervals

8:22am on Wednesday 24th of June, 2026 AEST
Key Points
  • 15 holes drilled totaling 1,883.9 metres at Red Hill
  • Five of six holes intersect massive sulphide mineralisation
  • Visual confirmation of 272 metres strike length, open along strike and down-dip
  • High-grade 2-metre interval with 33% chalcopyrite logged
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Azzuro Resources (ASX:AZ9)
OPEN ARTICLE