middle.news
Azzuro Resources Confirms Extended Massive Sulphide Mineralisation at Red Hill with High-Grade Copper Intervals
8:22am on Wednesday 24th of June, 2026 AEST
•
Mining
Read Story
Azzuro Resources Confirms Extended Massive Sulphide Mineralisation at Red Hill with High-Grade Copper Intervals
8:22am on Wednesday 24th of June, 2026 AEST
Key Points
15 holes drilled totaling 1,883.9 metres at Red Hill
Five of six holes intersect massive sulphide mineralisation
Visual confirmation of 272 metres strike length, open along strike and down-dip
High-grade 2-metre interval with 33% chalcopyrite logged
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Azzuro Resources (ASX:AZ9)
OPEN ARTICLE