middle.news

Patagonia Lithium Reports 58% Pumping Rate Increase from Well 2

8:42am on Tuesday 30th of June, 2026 AEST Mining
Read Story

Patagonia Lithium Reports 58% Pumping Rate Increase from Well 2

8:42am on Tuesday 30th of June, 2026 AEST
Key Points
  • 58% pumping rate increase from Well 2 with minor pipe upgrade
  • Well 7 lined and ready for maiden pump test, assay at 296ppm lithium
  • Drilling underway at Well 8 on Cilon concession targeting high-grade zone
  • Formentera-Cilon project covers 19.5km² in Argentina’s lithium triangle
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Patagonia Lithium (ASX:PL3)
OPEN ARTICLE