middle.news

49 Metals Extends High-Grade Gold Feeder Structure at Gold Mountain with New Drilling Results

8:46am on Wednesday 1st of July, 2026 AEST Mining
Read Story

49 Metals Extends High-Grade Gold Feeder Structure at Gold Mountain with New Drilling Results

8:46am on Wednesday 1st of July, 2026 AEST
Key Points
  • 6.1m at 5.0g/t Au within 15.2m at 2.4g/t Au in hole DRC#16
  • Feeder structure remains open in all directions
  • Multiple mineralised zones intersected across project areas
  • 22-hole maiden RC drilling program with 9 assays pending
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about 49 Metals (ASX:49M)
OPEN ARTICLE