middle.news
49 Metals Extends High-Grade Gold Feeder Structure at Gold Mountain with New Drilling Results
8:46am on Wednesday 1st of July, 2026 AEST
•
Mining
Read Story
49 Metals Extends High-Grade Gold Feeder Structure at Gold Mountain with New Drilling Results
8:46am on Wednesday 1st of July, 2026 AEST
Key Points
6.1m at 5.0g/t Au within 15.2m at 2.4g/t Au in hole DRC#16
Feeder structure remains open in all directions
Multiple mineralised zones intersected across project areas
22-hole maiden RC drilling program with 9 assays pending
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
49 Metals (ASX:49M)
OPEN ARTICLE