middle.news

Li-FT Power Extends Lithium Mineralisation at Yellowknife with Strong Drill Results

5:37pm on Tuesday 30th of June, 2026 AEST Mining
Read Story

Li-FT Power Extends Lithium Mineralisation at Yellowknife with Strong Drill Results

5:37pm on Tuesday 30th of June, 2026 AEST
Key Points
  • 20 drill holes totaling 5,324m at Yellowknife Lithium Project
  • Significant lithium grades up to 1.65% Li2O over 17m in BIG East pegmatite
  • Drilling extends mineralisation along strike and at depth
  • Spodumene confirmed as primary lithium mineral
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Li-Ft Power (ASX:LFT)
OPEN ARTICLE