middle.news

Elixir Energy’s Lorelle-3H Well Signals Strong Transition to Gas Production

8:39am on Monday 6th of July, 2026 AEST Energy
Read Story

Elixir Energy’s Lorelle-3H Well Signals Strong Transition to Gas Production

8:39am on Monday 6th of July, 2026 AEST
Key Points
  • Lorelle-3H achieves sustained gas breakthrough after 5 days
  • Flowback operations align with modelling, fluid rates decline as gas rises
  • Production testing to commence in July targeting peak gas-condensate rates
  • Well results support commercial viability in Basin Centred Gas Play
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Elixir Energy (ASX:EXR)
OPEN ARTICLE