middle.news

Botala Energy Confirms Reservoir Permeability at Serowe-3.5B Ahead of Stimulation

9:25am on Wednesday 8th of July, 2026 AEST Energy
Read Story

Botala Energy Confirms Reservoir Permeability at Serowe-3.5B Ahead of Stimulation

9:25am on Wednesday 8th of July, 2026 AEST
Key Points
  • Diagnostic Stimulation Injection Test confirms reservoir permeability
  • Step Rate Test to determine stimulation pumping pressure
  • Production testing to target sustained gas flow above 70 GJ/day
  • Supports advancement of Bankable Feasibility Study and reserves certification
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Botala Energy (ASX:BTE)
OPEN ARTICLE