middle.news
Brookside Energy Advances Sabres Well Drilling with Intermediate Casing Set and Lateral Section Underway
8:23am on Wednesday 22nd of July, 2026 AEST
•
Energy
Read Story
Brookside Energy Advances Sabres Well Drilling with Intermediate Casing Set and Lateral Section Underway
8:23am on Wednesday 22nd of July, 2026 AEST
Key Points
Intermediate casing set and pressure-tested at Sabres well
Curve landed in Sycamore Formation as planned
Lateral drilling underway, reaching 9,800 feet measured depth
Production casing to follow before moving to Whalers well
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Brookside Energy (ASX:BRK)
OPEN ARTICLE