middle.news

Australian Mines fast-tracks Flemington PFS to explore tripling scandium output

8:52am on Monday 27th of July, 2026 AEST Mining
Read Story

Australian Mines fast-tracks Flemington PFS to explore tripling scandium output

8:52am on Monday 27th of July, 2026 AEST
Key Points
  • PFS expanded to assess up to 180 tpa scandium oxide production
  • Scoping study shows post-tax NPV8 of US$860 million at US$3,000/kg Sc₂O₃
  • New drilling program to test resource extensions and support metallurgical work
  • Initial capital cost estimated at US$125 million for 60 tpa operation
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Australian Mines (ASX:AUZ)
OPEN ARTICLE