middle.news
Australian Mines fast-tracks Flemington PFS to explore tripling scandium output
8:52am on Monday 27th of July, 2026 AEST
•
Mining
Read Story
Australian Mines fast-tracks Flemington PFS to explore tripling scandium output
8:52am on Monday 27th of July, 2026 AEST
Key Points
PFS expanded to assess up to 180 tpa scandium oxide production
Scoping study shows post-tax NPV8 of US$860 million at US$3,000/kg Sc₂O₃
New drilling program to test resource extensions and support metallurgical work
Initial capital cost estimated at US$125 million for 60 tpa operation
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Australian Mines (ASX:AUZ)
OPEN ARTICLE