middle.news

Galilee Energy Starts Zydeco-1 Drilling with $100K Cost Cut and 13.7 Bcf Gas Target

8:13am on Friday 31st of July, 2026 AEST Energy
Read Story

Galilee Energy Starts Zydeco-1 Drilling with $100K Cost Cut and 13.7 Bcf Gas Target

8:13am on Friday 31st of July, 2026 AEST
Key Points
  • Zydeco-1 well spudded on 1 July 2026, on schedule and budget
  • Revised casing design cuts tubular costs by approximately US$100,000
  • Gross prospective resources estimated at 13.7 Bcf gas and 610,000 barrels condensate
  • Fixed-price drilling contract secured with RFC Drilling, LLC
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Galilee Energy (ASX:GLL)
OPEN ARTICLE