middle.news

Challenger Gold Strengthens Hualilan with New Infill Drilling Results

4:23pm on Friday 31st of July, 2026 AEST Mining
Read Story

Challenger Gold Strengthens Hualilan with New Infill Drilling Results

4:23pm on Friday 31st of July, 2026 AEST
Key Points
  • Strong 10m-spaced infill drilling results in Sanchez, Norte, Magnata, and Sentazon pits
  • Updated Mineral Resource Estimate totals 132Mt at 0.57 g/t Au with 2.7 million AuEq ounces
  • Ore Reserve supports 450,000 wet tonnes over three years via toll treatment at Casposo
  • Comprehensive metallurgical test work confirms recoveries and processing assumptions
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Challenger Gold (ASX:CEL)
OPEN ARTICLE