middle.news

Black Canyon Confirms 400m Southern Extension with High-Grade Wandanya Manganese

8:16am on Wednesday 12th of August, 2026 AEST Mining
Read Story

Black Canyon Confirms 400m Southern Extension with High-Grade Wandanya Manganese

8:16am on Wednesday 12th of August, 2026 AEST
Key Points
  • 400m southern extension confirmed with high-grade manganese
  • Multiple drill intervals exceed 40% manganese indicating direct shipping ore potential
  • Maiden Mineral Resource Estimate on track for September 2026
  • 5,000m RC drilling planned to test 9km mineralised system
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Black Canyon (ASX:BCA)
OPEN ARTICLE