middle.news
Black Canyon Confirms 400m Southern Extension with High-Grade Wandanya Manganese
8:16am on Wednesday 12th of August, 2026 AEST
•
Mining
Read Story
Black Canyon Confirms 400m Southern Extension with High-Grade Wandanya Manganese
8:16am on Wednesday 12th of August, 2026 AEST
Key Points
400m southern extension confirmed with high-grade manganese
Multiple drill intervals exceed 40% manganese indicating direct shipping ore potential
Maiden Mineral Resource Estimate on track for September 2026
5,000m RC drilling planned to test 9km mineralised system
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Black Canyon (ASX:BCA)
OPEN ARTICLE