middle.news

Osmond Resources Confirms High-Grade Continuity at Orión Project

8:18am on Friday 14th of August, 2026 AEST Mining
Read Story

Osmond Resources Confirms High-Grade Continuity at Orión Project

8:18am on Friday 14th of August, 2026 AEST
Key Points
  • Drill hole SOR-07A confirms mineral seam continuity in Southern Block
  • Maiden Mineral Resource Estimate and Scoping Study expected in Q3 2026
  • Flowsheet designed for 2 Mtpa processing producing zircon, titanium, and rare earth concentrates
  • Mineralogical and processing tests show consistency between outcrop and drill core samples
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Osmond Resources (ASX:OSM)
OPEN ARTICLE