middle.news
Leeuwin Metals Secures JV with Arrow over Pilbara Iron and Copper Tenements
9:29am on Tuesday 18th of August, 2026 AEST
•
Mining
Read Story
Leeuwin Metals Secures JV with Arrow over Pilbara Iron and Copper Tenements
9:29am on Tuesday 18th of August, 2026 AEST
Key Points
Arrow acquires 70% JV interest in Pilbara tenement E08/3668
Leeuwin retains 30% free-carried interest through feasibility
Tenements include 2.4km of direct-shipping grade channel iron deposits
Arrow holds 12-month option for two additional tenements
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Leeuwin Metals (ASX:LM1)
OPEN ARTICLE