middle.news

Leeuwin Metals Secures JV with Arrow over Pilbara Iron and Copper Tenements

9:29am on Tuesday 18th of August, 2026 AEST Mining
Read Story

Leeuwin Metals Secures JV with Arrow over Pilbara Iron and Copper Tenements

9:29am on Tuesday 18th of August, 2026 AEST
Key Points
  • Arrow acquires 70% JV interest in Pilbara tenement E08/3668
  • Leeuwin retains 30% free-carried interest through feasibility
  • Tenements include 2.4km of direct-shipping grade channel iron deposits
  • Arrow holds 12-month option for two additional tenements
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Leeuwin Metals (ASX:LM1)
OPEN ARTICLE