middle.news

Viking Mines Validates Ore Sorting Boost at Linka Tungsten Project

9:48am on Thursday 20th of August, 2026 AEST Mining
Read Story

Viking Mines Validates Ore Sorting Boost at Linka Tungsten Project

9:48am on Thursday 20th of August, 2026 AEST
Key Points
  • Ore sorting upgrades tungsten grade up to 4.1x feed
  • Tungsten recoveries reach 93% in Conquest Pit sample
  • Low-grade waste rejected at ~0.2% WO3
  • Potential to upgrade existing surface stockpiles
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Viking Mines (ASX:VKA)
OPEN ARTICLE