middle.news
Viking Mines Validates Ore Sorting Boost at Linka Tungsten Project
9:48am on Thursday 20th of August, 2026 AEST
•
Mining
Read Story
Viking Mines Validates Ore Sorting Boost at Linka Tungsten Project
9:48am on Thursday 20th of August, 2026 AEST
Key Points
Ore sorting upgrades tungsten grade up to 4.1x feed
Tungsten recoveries reach 93% in Conquest Pit sample
Low-grade waste rejected at ~0.2% WO3
Potential to upgrade existing surface stockpiles
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Viking Mines (ASX:VKA)
OPEN ARTICLE