middle.news

Horizon Gold Confirms 800m Extension at Howards and Strong Intercepts at Gum Creek

9:13am on Tuesday 25th of August, 2026 AEST Mining
Read Story

Horizon Gold Confirms 800m Extension at Howards and Strong Intercepts at Gum Creek

9:13am on Tuesday 25th of August, 2026 AEST
Key Points
  • 800m southern extension confirmed at Howards prospect
  • High-grade gold intercepts at Heron South support down-dip expansion
  • Melbourne Bitter drilling highlights potential resource growth to the south
  • Follow-up RC and diamond drilling underway across multiple prospects
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Horizon Gold (ASX:HRN)
OPEN ARTICLE