middle.news
Flynn Gold Advances Firetower Polymetallic Project with New High-Grade Drill Results
9:36am on Friday 28th of August, 2026 AEST
•
Mining
Read Story
Flynn Gold Advances Firetower Polymetallic Project with New High-Grade Drill Results
9:36am on Friday 28th of August, 2026 AEST
Key Points
Multiple polymetallic mineralised zones confirmed in 2026 drilling
High-grade intercepts include 1.9m at 2.02g/t Au and 0.56% WO3
Mineralisation remains open at depth and along strike
Metallurgical testwork and maiden Mineral Resource Estimate planned
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Flynn Gold (ASX:FG1)
OPEN ARTICLE