middle.news

BCM appoints Altris to lead FEED phase for Ema Rare Earth Project

8:05am on Monday 31st of August, 2026 AEST Mining
Read Story

BCM appoints Altris to lead FEED phase for Ema Rare Earth Project

8:05am on Monday 31st of August, 2026 AEST
Key Points
  • Altris Engineering continues from BFS as Lead Design Engineer
  • FEED phase to refine engineering, procurement, and capital cost
  • 24-week FEED program targets enhanced project maturity ahead of FID
  • Transition planned to Brazilian contractor for detailed design
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Brazilian Critical Minerals (ASX:BCM)
OPEN ARTICLE