middle.news

Mt Mulgine PFS Confirms World’s Largest, Lowest-Cost Tungsten Project

8:27am on Tuesday 1st of September, 2026 AEST Mining
Read Story

Mt Mulgine PFS Confirms World’s Largest, Lowest-Cost Tungsten Project

8:27am on Tuesday 1st of September, 2026 AEST
Key Points
  • 21-year mine life with 8 Mtpa base case
  • Pre-tax NPV8 of A$6.8 billion and IRR of 55%
  • All-in sustaining cost of US$127 per mtu WO3
  • Expansion option to 16 Mtpa with higher returns
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Tungsten Mining (ASX:TGN)
OPEN ARTICLE