middle.news

Cauldron Extends Manyingee Uranium Mineralisation by 2.5 Kilometres

9:47am on Wednesday 2nd of September, 2026 AEST Mining
Read Story

Cauldron Extends Manyingee Uranium Mineralisation by 2.5 Kilometres

9:47am on Wednesday 2nd of September, 2026 AEST
Key Points
  • Manyingee South mineralisation extended ~2.5 km upstream
  • Manyingee North strike length expanded by ~2.5 km northwards and 550 m southwards
  • Existing Inferred Mineral Resources: 14.9 Mlbs at Manyingee South, 9.8 Mlbs at Manyingee North
  • Passive seismic surveys identify over 30 palaeochannels for future drilling
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Cauldron Energy (ASX:CXU)
OPEN ARTICLE