middle.news

Minbos Advances Cabinda Project with BFA Loan Drawdown and Phase 2 Construction

8:22am on Wednesday 2nd of September, 2026 AEST Mining
Read Story

Minbos Advances Cabinda Project with BFA Loan Drawdown and Phase 2 Construction

8:22am on Wednesday 2nd of September, 2026 AEST
Key Points
  • FGC finalises guarantee for US$1.3M BFA loan drawdown
  • Phase 2 construction steel framework shipped from Portugal
  • Construction teams to arrive in Cabinda early September
  • Mining contractor shortlist progressing with agreements imminent
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Minbos Resources (ASX:MNB)
OPEN ARTICLE