middle.news

Hot Chili’s La Verde Drilling Points to a Larger High-Grade Starter Zone

8:12am on Tuesday 8th of September, 2026 AEST Mining
Read Story

Hot Chili’s La Verde Drilling Points to a Larger High-Grade Starter Zone

8:12am on Tuesday 8th of September, 2026 AEST
Key Points
  • DKP063 returns 398m at 0.45% CuEq from surface
  • 62m at 0.91% CuEq includes 34m at 1.00% CuEq
  • DKP064 and partial DKP075 results support broad mineralised continuity
  • DKD060 extends mineralisation to 765.2m down-hole
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Hot Chili (ASX:HCH)
OPEN ARTICLE