middle.news
Hot Chili’s La Verde Drilling Points to a Larger High-Grade Starter Zone
8:12am on Tuesday 8th of September, 2026 AEST
•
Mining
Read Story
Hot Chili’s La Verde Drilling Points to a Larger High-Grade Starter Zone
8:12am on Tuesday 8th of September, 2026 AEST
Key Points
DKP063 returns 398m at 0.45% CuEq from surface
62m at 0.91% CuEq includes 34m at 1.00% CuEq
DKP064 and partial DKP075 results support broad mineralised continuity
DKD060 extends mineralisation to 765.2m down-hole
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Hot Chili (ASX:HCH)
OPEN ARTICLE