middle.news

Toubani Drills 28 Metres at 8.86g/t Gold at Foroko

8:30am on Wednesday 16th of September, 2026 AEST Mining
Read Story

Toubani Drills 28 Metres at 8.86g/t Gold at Foroko

8:30am on Wednesday 16th of September, 2026 AEST
Key Points
  • 28m at 8.86g/t gold, including 3m at 61.2g/t
  • 12m at 12.1g/t gold, including 4m at 24.9g/t
  • 108-hole, 19,138-metre Foroko drilling programme
  • Mineralisation delineated over a 2.5km strike length
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Toubani Resources (ASX:TRE)
OPEN ARTICLE