middle.news
Toubani Drills 28 Metres at 8.86g/t Gold at Foroko
8:30am on Wednesday 16th of September, 2026 AEST
•
Mining
Read Story
Toubani Drills 28 Metres at 8.86g/t Gold at Foroko
8:30am on Wednesday 16th of September, 2026 AEST
Key Points
28m at 8.86g/t gold, including 3m at 61.2g/t
12m at 12.1g/t gold, including 4m at 24.9g/t
108-hole, 19,138-metre Foroko drilling programme
Mineralisation delineated over a 2.5km strike length
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Toubani Resources (ASX:TRE)
OPEN ARTICLE