middle.news

Wildcat Wins Institutional Backing for Faster Tabba Tabba Development

9:30am on Monday 21st of September, 2026 AEST Mining
Read Story

Wildcat Wins Institutional Backing for Faster Tabba Tabba Development

9:30am on Monday 21st of September, 2026 AEST
Key Points
  • A$60 million institutional placement at A$0.305 per share
  • 196.7 million new shares to be issued in two tranches
  • Funds directed to plant engineering, roads, village development and exploration
  • Tabba Tabba DFS remains targeted for calendar 2026
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Wildcat Resources (ASX:WC8)
OPEN ARTICLE