middle.news

AEM’s HPA pipeline points to a larger Quebec growth story

2:14pm on Monday 21st of September, 2026 AEST Advanced Materials
Read Story

AEM’s HPA pipeline points to a larger Quebec growth story

2:14pm on Monday 21st of September, 2026 AEST
Key Points
  • 225 customer qualification projects at the end of August
  • Second-half 2026 sales forecast at approximately 40-60 tonnes
  • Cap-Chat capacity targeted to reach 3,000 tonnes per annum in 2026
  • Stage 2 expansion would lift total capacity to 6,000 tonnes per annum from 2029
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Advanced Engineered Materials (ASX:AEM)
OPEN ARTICLE