middle.news
Talonx positions Beaker 2 gold as the first test of a two-project strategy
8:12am on Wednesday 23rd of September, 2026 AEST
•
Mining
Read Story
Talonx positions Beaker 2 gold as the first test of a two-project strategy
8:12am on Wednesday 23rd of September, 2026 AEST
Key Points
4m at 22.1g/t gold from 31m at Beaker 2, including 2m at 42.4g/t
Shallow oxide zone defined across approximately 400m by 300m and open in multiple directions
Kihabe and Nxuu host a combined 27Mt JORC (2012) Zn-Pb-Ag resource
Historical Kihabe drilling returned copper intersections, but copper is excluded from the current resource
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Talonx Resources (ASX:TXR)
OPEN ARTICLE