middle.news
Auric’s Munda drilling points to more high-grade gold beyond planned pit
8:25am on Thursday 24th of September, 2026 AEST
•
Mining
Read Story
Auric’s Munda drilling points to more high-grade gold beyond planned pit
8:25am on Thursday 24th of September, 2026 AEST
Key Points
4m at 10.49 g/t gold in western extension drilling
Near-surface grade-control results include 4m at 19.34 g/t
92 grade-control holes completed across 2,226 metres
Geotechnical drilling finished ahead of Stage 2 pit design
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Auric Mining (ASX:AWJ)
OPEN ARTICLE