middle.news
Bindi’s Ravni Drilling Opens Three Follow-Up Paths
5:18pm on Thursday 24th of September, 2026 AEST
•
Mining
Read Story
Bindi’s Ravni Drilling Opens Three Follow-Up Paths
5:18pm on Thursday 24th of September, 2026 AEST
Key Points
2,159.4 metres of maiden diamond drilling across 14 holes
Drenjak intersection of 2.0m at 21.6 g/t gold, including 1.0m at 37.8 g/t
Rudnjak North silver result of 5.0m at 71.1 g/t, including 1.0m at 341 g/t
$2.71 million annual loss and $2.18 million operating cash outflow
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Bindi Metals (ASX:BIM)
OPEN ARTICLE