middle.news
Karoon Targets Baúna Recovery After SPS-92 Cable Fault
8:36am on Monday 28th of September, 2026 AEST
•
Oil and Gas
Read Story
Karoon Targets Baúna Recovery After SPS-92 Cable Fault
8:36am on Monday 28th of September, 2026 AEST
Key Points
SPS-92 operating conservatively on two electrical phases
Approximately 3,500 bopd deferred until cable replacement
Baúna production guidance reduced to 5.4-5.7 MMbbl
Total 2026 production guidance cut to 6.6-7.2 MMboe
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Karoon Energy (ASX:KAR)
OPEN ARTICLE