middle.news
Peninsula Finds Stronger Lance Wellflows as Uranium Ramp-Up Enters Test Phase
1:39pm on Monday 28th of September, 2026 AEST
•
Mining
Read Story
Peninsula Finds Stronger Lance Wellflows as Uranium Ramp-Up Enters Test Phase
1:39pm on Monday 28th of September, 2026 AEST
Key Points
HH17 operating at approximately 500 GPM, above its 450 GPM design basis
HH15 producing at approximately 350 GPM without reported peroxide gassing issues
New wells in HH12, HH14 and HH16 show stronger flow and uranium results
Lower-grade MU-1 wells temporarily suspended to focus acid and operating resources
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Peninsula Energy (ASX:PEN)
OPEN ARTICLE