middle.news

Great Western spots possible VHMS edge at Seymour

8:48am on Wednesday 30th of September, 2026 AEST • Mining
Read Story

Great Western spots possible VHMS edge at Seymour

8:48am on Wednesday 30th of September, 2026 AEST
Key Points
  • 12m at 0.33% zinc, 7.1g/t silver and 0.09% lead from 77m
  • Higher-grade sub-intervals include 1m at 1.02% zinc and 2m at 20.2g/t silver
  • Seymour is interpreted as the cooler margin of a VHMS mound system
  • Follow-up drilling, airborne magnetics and potential down-hole EM planned
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Great Western Exploration (ASX:GTE)
OPEN ARTICLE