middle.news

Aguia’s Santa Barbara mine reaches a first cost-covering month

9:05am on Tuesday 6th of October, 2026 AEDT • Mining
Read Story

Aguia’s Santa Barbara mine reaches a first cost-covering month

9:05am on Tuesday 6th of October, 2026 AEDT
Key Points
  • 36.75 ounces of gold produced from 105 dry tonnes in September
  • AUD$218,000 gross market value, with Colombian operating and corporate costs covered for the first time
  • Run-of-mine grade averaged 10.88 g/t gold, with a recent batch grading 12.75 g/t
  • Additional equipment bought to target more than 200 tonnes per month by end-2026
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Aguia Resources (ASX:AGR)
OPEN ARTICLE