middle.news

Metro Mining Targets Recovery After Bauxite Hills Channel Disruption

9:35am on Monday 12th of October, 2026 AEDT • Mining
Read Story

Metro Mining Targets Recovery After Bauxite Hills Channel Disruption

9:35am on Monday 12th of October, 2026 AEDT
Key Points
  • 659,000 WMT shipped in September 2026
  • Year-to-date shipments reached 4.013 million WMT
  • Sand-bank collapse cut channel depth from 1.8 metres to 1.3 metres
  • Absenteeism and staff turnover limited equipment utilisation
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Metro Mining (ASX:MMI)
OPEN ARTICLE