middle.news
Metro Mining Targets Recovery After Bauxite Hills Channel Disruption
9:35am on Monday 12th of October, 2026 AEDT
•
Mining
Read Story
Metro Mining Targets Recovery After Bauxite Hills Channel Disruption
9:35am on Monday 12th of October, 2026 AEDT
Key Points
659,000 WMT shipped in September 2026
Year-to-date shipments reached 4.013 million WMT
Sand-bank collapse cut channel depth from 1.8 metres to 1.3 metres
Absenteeism and staff turnover limited equipment utilisation
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Metro Mining (ASX:MMI)
OPEN ARTICLE