middle.news

Alara’s Oman mine gains an eight-year runway with audited copper reserves

10:00am on Wednesday 14th of October, 2026 AEDT • Mining
Read Story

Alara’s Oman mine gains an eight-year runway with audited copper reserves

10:00am on Wednesday 14th of October, 2026 AEDT
Key Points
  • 7.70Mt Probable Ore Reserve supports approximately eight years at 1.0Mtpa
  • 10.23Mt Mineral Resource contains 79.9kt of copper and 81.4koz of gold
  • 98% of resources are Measured and Indicated, including 4.76Mt Measured
  • Ore Reserves fell 8% after 0.86Mt of mining depletion
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Alara Resources (ASX:AUQ)
OPEN ARTICLE