middle.news
Alara’s Oman mine gains an eight-year runway with audited copper reserves
10:00am on Wednesday 14th of October, 2026 AEDT
•
Mining
Read Story
Alara’s Oman mine gains an eight-year runway with audited copper reserves
10:00am on Wednesday 14th of October, 2026 AEDT
Key Points
7.70Mt Probable Ore Reserve supports approximately eight years at 1.0Mtpa
10.23Mt Mineral Resource contains 79.9kt of copper and 81.4koz of gold
98% of resources are Measured and Indicated, including 4.76Mt Measured
Ore Reserves fell 8% after 0.86Mt of mining depletion
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Alara Resources (ASX:AUQ)
OPEN ARTICLE