middle.news

Ramsay’s three-well helium test opens the door to a modular pilot

9:39am on Tuesday 20th of October, 2026 AEDT • Energy
Read Story

Ramsay’s three-well helium test opens the door to a modular pilot

9:39am on Tuesday 20th of October, 2026 AEDT
Key Points
  • Helium flowed to surface across three Ramsay wells spanning approximately 2.2 kilometres
  • Project-wide air-corrected helium concentration averaged approximately 15.2%
  • Ramsay 3 reached a record 14,000 barrels of fluid per day
  • Modelled helium potential reached up to 37 Mscf per well per day
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Gold Hydrogen (ASX:GHY)
OPEN ARTICLE