middle.news
Ramsay’s three-well helium test opens the door to a modular pilot
9:39am on Tuesday 20th of October, 2026 AEDT
•
Energy
Read Story
Ramsay’s three-well helium test opens the door to a modular pilot
9:39am on Tuesday 20th of October, 2026 AEDT
Key Points
Helium flowed to surface across three Ramsay wells spanning approximately 2.2 kilometres
Project-wide air-corrected helium concentration averaged approximately 15.2%
Ramsay 3 reached a record 14,000 barrels of fluid per day
Modelled helium potential reached up to 37 Mscf per well per day
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Gold Hydrogen (ASX:GHY)
OPEN ARTICLE