middle.news
Patagonia Lithium's Well 8 strengthens the case for a Cilon resource upgrade
8:23am on Thursday 22nd of October, 2026 AEDT
•
Mining
Read Story
Patagonia Lithium's Well 8 strengthens the case for a Cilon resource upgrade
8:23am on Thursday 22nd of October, 2026 AEDT
Key Points
Well 8 reached 485 metres and returned lithium grades up to 232 mg/L
72-hour pump test produced 2,043 L/h, with recovery to static level within 24 hours
Corrected estimate reduced inferred pumped lithium to a preferred 30kg, or 159kg LCE
Well 9 ended in clay after one low-flow packer test and drilling has stopped
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Patagonia Lithium (ASX:PL3)
OPEN ARTICLE