middle.news
Metgasco reveals 31.45 PJe resource base after Cooper Basin reserve reset
9:52am on Monday 26th of October, 2026 AEDT
•
Oil and Gas
Read Story
Metgasco reveals 31.45 PJe resource base after Cooper Basin reserve reset
9:52am on Monday 26th of October, 2026 AEDT
Key Points
2P reserves reduced to 6.2 PJe from 36.45 PJe
1P reserves reduced to 0.7 PJe from 18.15 PJe
30.15 PJe reclassified as 2C contingent resources
Gas in place at Odin and Vali remains unchanged
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Metgasco (ASX:MEL)
OPEN ARTICLE