middle.news

Metgasco reveals 31.45 PJe resource base after Cooper Basin reserve reset

9:52am on Monday 26th of October, 2026 AEDT • Oil and Gas
Read Story

Metgasco reveals 31.45 PJe resource base after Cooper Basin reserve reset

9:52am on Monday 26th of October, 2026 AEDT
Key Points
  • 2P reserves reduced to 6.2 PJe from 36.45 PJe
  • 1P reserves reduced to 0.7 PJe from 18.15 PJe
  • 30.15 PJe reclassified as 2C contingent resources
  • Gas in place at Odin and Vali remains unchanged
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Metgasco (ASX:MEL)
OPEN ARTICLE