middle.news
Zeotech takes AusPozz into commercial-scale production testing
9:45am on Monday 26th of October, 2026 AEDT
•
Materials and Mining
Read Story
Zeotech takes AusPozz into commercial-scale production testing
9:45am on Monday 26th of October, 2026 AEDT
Key Points
Approximately 800 tonnes of Toondoon kaolin entered commercial-scale AusPozz processing
Independent mining tests indicated potential binder, cost and embodied-carbon reductions
zeoteCH₄ landfill cells recorded 92% lower average methane emissions than controls
VINCI Construction MOU creates a framework for concrete trials and demonstrations
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Zeotech (ASX:ZEO)
OPEN ARTICLE