middle.news
GCM expands VHD testing pipeline with 18 products shipped to customers
4:37pm on Wednesday 28th of October, 2026 AEDT
•
Mining and Thermal Management Technology
Read Story
GCM expands VHD testing pipeline with 18 products shipped to customers
4:37pm on Wednesday 28th of October, 2026 AEDT
Key Points
24 customer-specific VHD products in the commercialisation pipeline
18 products shipped for customer evaluation and six in design or manufacture
Independent preliminary LED testing showed temperatures 3.1°C to 3.3°C lower than aluminium comparators
ALVC joint development programme moved into physical prototyping
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Gcm (ASX:GCM)
OPEN ARTICLE