middle.news

Li-S Energy puts lithium-sulfur cells before US Army after Pegasus flight success

8:36am on Thursday 29th of October, 2026 AEDT • Advanced Manufacturing
Read Story

Li-S Energy puts lithium-sulfur cells before US Army after Pegasus flight success

8:36am on Thursday 29th of October, 2026 AEDT
Key Points
  • First lithium-sulfur cell delivery to US Army DEVCOM C5ISR Center
  • Pegasus flew almost two hours and more than 75 kilometres on one 382 Wh pack
  • Li-S Energy claims 80% greater range and flight time than an equivalent lithium polymer pack on a cell-weight basis
  • Phase 4 study continues to examine a manufacturing pathway towards 1 GWh of annual capacity
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about Li-S Energy (ASX:LIS)
OPEN ARTICLE