middle.news
Li-S Energy puts lithium-sulfur cells before US Army after Pegasus flight success
8:36am on Thursday 29th of October, 2026 AEDT
•
Advanced Manufacturing
Read Story
Li-S Energy puts lithium-sulfur cells before US Army after Pegasus flight success
8:36am on Thursday 29th of October, 2026 AEDT
Key Points
First lithium-sulfur cell delivery to US Army DEVCOM C5ISR Center
Pegasus flew almost two hours and more than 75 kilometres on one 382 Wh pack
Li-S Energy claims 80% greater range and flight time than an equivalent lithium polymer pack on a cell-weight basis
Phase 4 study continues to examine a manufacturing pathway towards 1 GWh of annual capacity
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
Li-S Energy (ASX:LIS)
OPEN ARTICLE