middle.news

49 Metals finds scale and structure at Gold Mountain

9:59am on Friday 30th of October, 2026 AEDT • Mining
Read Story

49 Metals finds scale and structure at Gold Mountain

9:59am on Friday 30th of October, 2026 AEDT
Key Points
  • 170.7m at 0.9g/t gold in DRC#22, the project’s thickest reported intersection
  • 27.4m at 8.3g/t gold in DRC#9 confirmed a high-grade feeder corridor
  • Gold and/or silver mineralisation reported in all 22 maiden RC holes
  • Approximately 3,500m of follow-up drilling underway across 10 to 11 holes
Read Story
middle.

Tap to Read

Tap the card to read the full analysis
about 49 Metals (ASX:49M)
OPEN ARTICLE