middle.news
St George’s Araxá project gains scale as testing and permitting accelerate
9:07am on Friday 30th of October, 2026 AEDT
•
Mining
Read Story
St George’s Araxá project gains scale as testing and permitting accelerate
9:07am on Friday 30th of October, 2026 AEDT
Key Points
111.2Mt Araxá resource at 3.57% TREO and 0.57% Nb₂O₅
Measured and Indicated resources up 155% to 75.2Mt
Record drilling included 135.1m at 4.86% TREO from surface
Environmental assessment lodged and pilot plant test work underway
Read Story
middle.
Tap to Read
Tap the card to read the full analysis
about
St George Mining (ASX:SGQ)
OPEN ARTICLE